Mechanical Rigging, Crane Tonnage & Refrigerant Sizing Guide
How our licensed engineers calculate crane pick capacities, hydraulic gantry configurations, vacuum recovery cylinders, and municipal structural load distributions for turnkey mechanical decommissioning.
1. Mobile Crane Sizing & Pick Radii for Rooftop RTUs
Crane sizing depends not merely on unit weight, but on the horizontal pick radius from crane outriggers to the roof curb. A 10-ton packaged RTU located 120 feet back on an 8-story building typically requires a 150 to 200-ton all-terrain mobile crane with a luffing jib and engineered outrigger matting.
2. Basement Boiler Extraction: Gantry vs. Sectioning
Cast iron boilers can be split along nipple seams and unbolted into 300–800 lb individual sections for hand-truck or machine-skate extraction. Large Scotch Marine steel firetube boilers (10,000 to 50,000+ lbs) require cold cutting into manageable cylindrical rings and rigging through access shafts via modular hydraulic gantries.
3. Chiller Refrigerant Recovery Volume Calculations
Centrifugal and screw chillers hold between 1.5 to 2.5 lbs of refrigerant per ton of cooling capacity. A 500-ton chiller contains roughly 1,000 lbs of R-134a or R-123. To prevent cylinder overfilling, DOT regulations limit recovery cylinder liquid capacity to 80% at 77°F, requiring staged 1,000 lb DOT reclamation tanks.
4. Fuel Oil Storage Tank Sizing & Slurry Volume
When decommissioning underground storage tanks (USTs) in place, the volume of certified flowable concrete slurry or inert structural foam equals the gross vessel volume (e.g. 1,000 gallons = ~5 cubic yards of flowable fill). Interior cleaning must extract 100% of bottom sediment before filling.
Mechanical Decommissioning & Rigging Estimator
Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.
Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filingsPush-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoistingAPI 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificateDOT street closure, engineered crane lift plans & curb cap weatherproofingMechanical Decommissioning, Heavy Rigging & Equipment Removal Technical & Safety Specs in NY, NJ & CT
Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.
| Equipment Category | Rigging & Extraction Method | Environmental & EPA Protocol | Permits & Code Filings | Turnaround & Capacity |
|---|---|---|---|---|
| Heating Boilers & Oil Tanks | Hydraulic gantries, machine skates, cold cutting, vacuum sludge tankers | Inert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screening | Municipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure | 2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks |
| Packaged HVAC & AC Units | 40 to 300-ton mobile cranes, street closure rigging, curb cap flashing | EPA Section 608 certified deep vacuum freon recovery, electrical LOTO | DOT street closure permits, crane lift plans, pedestrian sidewalk protection | 3 to 150-ton RTUs · Weekend & Overnight Picks |
| Industrial Chillers & Towers | Engineered lift gantries, hydraulic toe jacks, lowboy heavy transport | High-volume push-pull freon reclamation, oil manifesting, glycol loop draining | DEP air resources retirement, hazardous waste manifests, PE stamped lift plans | 50 to 1,500+ Tons (Centrifugal, Screw, Absorption) |
| Commercial Refrigeration Racks | Cam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioning | Multiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifests | Commercial lease surrender environmental sign-offs & scrap recycling certificates | Single Box to 100,000 Sq Ft Supermarket & Cold Storage |
Ready to Decommission or Remove Heavy Mechanical Infrastructure?
We manage every stage—from municipal DOB/DEP permits and EPA Section 608 refrigerant recovery to heavy crane rigging and scrap credit offsets. Serving NY, NJ, CT and nationwide with a 5-minute callback goal.