Skip to main content
24/7 Priority Decommissioning DispatchEPA Section 608 Certified · 5-Min Callback Goal

24/7 Mechanical Decommissioning & Removal Dispatch

Boilers, Chillers, Fuel Oil Tanks, HVAC RTUs & Commercial Refrigeration. Turnkey Permitting & EPA 608 Freon Recovery.

Attach Equipment / Nameplate Photo (Optional)Allows engineers to verify refrigerant charge, tonnage, and rigging dimensions
No file chosen
Licensed & Insured·EPA 608 Certified·Permits Managed
I Want More Information
Viewing Full Engineering Specs, Permit Protocols, Equipment Rigging Fleet & Regional MatrixBack to Dispatch Form ↑
Engineered Heavy Equipment & Environmental Fleet

Heavy Rigging, Crane & EPA Recovery Fleet

Our specialized fleet combines low-clearance basement hydraulic gantries, high-capacity vacuum tankers, EPA Section 608 high-volume liquid push-pull recovery carts, and 40 to 300-ton all-terrain mobile cranes.

100% LicensedComprehensive InsuranceFull commercial & environmental liability
EPA Section 608Universal CertifiedSafe refrigerant recovery & recycling
Turnkey PermitsDOB · DEC · DEP · EPAAll municipal & state filings managed
Tri-State & NationalNY · NJ · CT & 50 StatesMulti-site corporate rollout capacity
Heavy Rigging Specifications

Engineered Mechanical Decommissioning Systems

Every piece of equipment is maintained under strict OSHA, ASME, and EPA certification standards.

Heating & Fuel SystemsOSHA 1926 Subpart CC

Heavy Rigging & Hydraulic Gantry Crane Systems

Rigging Spec: 50-Ton to 200-Ton Modular Hydraulic Lift Gantries & Rollers
Capacity Rating: Cast iron boilers up to 60,000 lbs & scotch marine boilers
Best Application: Basement boiler room extractions, high-rise penthouses, and tight sub-grade mechanical vaults
Key Engineering Capabilities:
  • •Low-clearance modular gantry tracks engineered for restricted basement access
  • •Hydraulic toe jacks, precision machine skates, and heavy nylon rigging slings
  • •Cold-cutting torches and plasma cutters with continuous hot-work fire watch protocols
  • •Complete structural load path verification and temporary shoring before extraction
Industrial Cooling SystemsEPA Section 608 Universal

Certified High-Recovery Evacuation & Refrigerant Recovery Stations

Rigging Spec: Dual-Stage Liquid/Vapor Push-Pull High CFM Recovery Stations
Capacity Rating: CFC-11, CFC-12, HCFC-22, HFC-134a, R-410A up to 10,000+ lbs charge
Best Application: Centrifugal chillers, absorption chillers, VRF systems, and commercial supermarket racks
Key Engineering Capabilities:
  • •Universal EPA Section 608 certified technicians with certified ARI recovery cylinders
  • •Deep vacuum evacuation down to 29" Hg with documented digital micron logs
  • •Certified reclamation facility transport manifests and EPA Form 3310 documentation
  • •Oil separation, acid testing, and certified hazardous waste manifesting
Climate Control SystemsFAA airspace notifications

Industrial Crane & Rooftop Rigging Pick Fleet

Rigging Spec: 70-Ton to 300-Ton All-Terrain Mobile Cranes & Spreader Bars
Capacity Rating: Packaged rooftop units (RTUs), chillers, cooling towers up to 30 tons per pick
Best Application: Urban rooftop HVAC removals, high-density street crane picks, and corporate headquarters
Key Engineering Capabilities:
  • •Full turnkey municipal street obstruction, lane closure, and pedestrian bridge permits
  • •Engineered lift plans stamped by licensed professional structural engineers
  • •Certified riggers, signal persons, and flaggers maintaining pedestrian exclusion perimeters
  • •Rapid weekend and overnight pick windows minimizing tenant and commercial traffic disruption
Heating & Fuel SystemsAPI 2015/1604

Confined Space Sludge Extraction & Tank Cutting Equipment

Rigging Spec: Explosion-Proof Pneumatic Saws, Sniffers & Vacuum Tankers
Capacity Rating: Underground (UST) & Aboveground (AST) fuel oil tanks 275 gal to 25,000+ gal
Best Application: Commercial #2, #4, and #6 heavy fuel oil tanks, industrial AST vaults, and residential tanks
Key Engineering Capabilities:
  • •Continuous four-gas atmospheric monitoring (LEL, O2, H2S, CO) and forced air ventilation
  • •Spark-free pneumatic cold-shearing saws eliminating open-flame explosion risks
  • •Liquid residual pump-out, bottom sludge disposal, and bio-wash decontamination
  • •State environmental department (DEC/DEP) tank closure reports and closure certificates
Refrigeration SystemsASHRAE 15 Mechanical Refrigeration Safety

Commercial Refrigerant Rack & Food-Grade Dismantling Systems

Rigging Spec: Sparkless Pipe Cutters, High-Flow Recovery Carts & Pallet Jacks
Capacity Rating: Parallel compressor racks, supermarket walk-in complexes, multi-deck display cases
Best Application: Supermarket remodels, distribution cold-storage warehouses, restaurant closures, and ghost kitchens
Key Engineering Capabilities:
  • •Selective mechanical disconnection allowing adjacent departments to remain operational
  • •Walk-in insulated box teardown with panel recycling and door hardware salvage
  • •Glycol loop drainage, safe collection, and certified environmental recycling
  • •Zero downtime transition coordination for grocery store equipment retrofits
Interactive Engineering Tool

Mechanical Decommissioning & Rigging Estimator

Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.

Decommissioning Parameters & Standards:
• Boilers: Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filings
• Chillers: Push-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoisting
• Fuel Tanks: API 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificate
• Rooftop RTUs: DOT street closure, engineered crane lift plans & curb cap weatherproofing
Estimated Rigging & Environmental Scope:Turnkey Rigging & EPA Manifest
Crane / Rigging Class:Modular Hydraulic Gantry & Skates
EPA Refrigerant Scope:EPA 608 Form 3310 Evacuation
Permit Filings:DOB Demo & State Environmental
Engineering & Environmental Specification Matrix

Mechanical Decommissioning, Heavy Rigging & Equipment Removal Technical & Safety Specs in NY, NJ & CT

Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.

Equipment CategoryRigging & Extraction MethodEnvironmental & EPA ProtocolPermits & Code FilingsTurnaround & Capacity
Heating Boilers & Oil TanksHydraulic gantries, machine skates, cold cutting, vacuum sludge tankersInert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screeningMunicipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks
Packaged HVAC & AC Units40 to 300-ton mobile cranes, street closure rigging, curb cap flashingEPA Section 608 certified deep vacuum freon recovery, electrical LOTODOT street closure permits, crane lift plans, pedestrian sidewalk protection3 to 150-ton RTUs · Weekend & Overnight Picks
Industrial Chillers & TowersEngineered lift gantries, hydraulic toe jacks, lowboy heavy transportHigh-volume push-pull freon reclamation, oil manifesting, glycol loop drainingDEP air resources retirement, hazardous waste manifests, PE stamped lift plans50 to 1,500+ Tons (Centrifugal, Screw, Absorption)
Commercial Refrigeration RacksCam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioningMultiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifestsCommercial lease surrender environmental sign-offs & scrap recycling certificatesSingle Box to 100,000 Sq Ft Supermarket & Cold Storage
Turnkey Mechanical Decommissioning Framework

4-Stage Code-Compliant Mechanical Decommissioning Protocol

We manage every stage of the process—from filing municipal permits and EPA 608 refrigerant recovery to heavy gantry rigging and certified metal recycling.

01
5-Minute Callback Goal

Priority Intake & Site Review

Submit your equipment details via our form above. Our engineering desk aims to call you back within 5 minutes to review equipment tonnage, access constraints, and project timeline.

02
DOB, DEC & Fire Marshal

Turnkey Permitting & Utility LOTO

We file all municipal building demolition and environmental permits, coordinate street closures, and execute certified electrical, gas, and hydronic lock-out/tag-out in your facility.

03
Safe Cold-Cutting & Cranes

EPA 608 Recovery & Heavy Rigging

Our universal certified technicians perform deep vacuum refrigerant reclamation into DOT cylinders, section heavy vessels, and extract equipment via hydraulic gantries and cranes.

04
Full Liability Termination

Manifests, Scrap & Official Closeout

We supply completed EPA Form 3310 manifests, hazardous waste disposal slips, certified metal scrap scale credits, and official municipal decommissioning closure letters.

Questions Answered

Heavy Rigging & Equipment FAQ

Detailed answers regarding mechanical decommissioning, EPA Section 608 compliance, municipal permitting, and heavy equipment extraction.

How do you extract commercial boilers from tight basements?

We utilize modular hydraulic gantry systems, low-profile machine skates, and certified cold-cutting or plasma dismantling under continuous fire watch, allowing safe removal through standard stairwells, sidewalk hatches, or areaways without structural demolition.

Do you supply mobile cranes and manage municipal street closure permits?

Yes. We operate mobile all-terrain cranes from 40 to 300 tons and handle all municipal Department of Transportation (DOT) street closure permits, traffic safety plans, flaggers, and pedestrian canopies.

Are your rigging crews certified for hazardous industrial facility work?

All United Decommission field rigging crews carry OSHA 30 cards, EPA Section 608 Universal certifications, rigging and signaling credentials, and adhere to strict lock-out/tag-out (LOTO) protocols.

We Go To The Customer · 24/7 Site Assessment & Heavy Removal

Ready to Decommission or Remove Heavy Mechanical Infrastructure?

We manage every stage—from municipal DOB/DEP permits and EPA Section 608 refrigerant recovery to heavy crane rigging and scrap credit offsets. Serving NY, NJ, CT and nationwide with a 5-minute callback goal.