Skip to main content
24/7 Priority Decommissioning DispatchEPA Section 608 Certified · 5-Min Callback Goal

24/7 Mechanical Decommissioning & Removal Dispatch

Boilers, Chillers, Fuel Oil Tanks, HVAC RTUs & Commercial Refrigeration. Turnkey Permitting & EPA 608 Freon Recovery.

Attach Equipment / Nameplate Photo (Optional)Allows engineers to verify refrigerant charge, tonnage, and rigging dimensions
No file chosen
Licensed & Insured·EPA 608 Certified·Permits Managed
I Want More Information
Viewing Full Engineering Specs, Permit Protocols, Equipment Rigging Fleet & Regional MatrixBack to Dispatch Form ↑
Engineering & Environmental Compliance Guides

Commercial Mechanical Decommissioning & Rigging Guides

Step-by-step technical guides explaining EPA Title VI refrigerant reclamation mandates, municipal Department of Buildings (DOB) mechanical demolition filings, underground storage tank abandonment procedures, and heavy crane rigging logistics.

100% LicensedComprehensive InsuranceFull commercial & environmental liability
EPA Section 608Universal CertifiedSafe refrigerant recovery & recycling
Turnkey PermitsDOB · DEC · DEP · EPAAll municipal & state filings managed
Tri-State & NationalNY · NJ · CT & 50 StatesMulti-site corporate rollout capacity
Regulatory Guide 01

EPA Section 608 Universal Refrigerant Recovery Protocols

Federal Clean Air Act regulations require documented deep-vacuum evacuation of all refrigerants before opening mechanical circuits or demolishing equipment. Learn the difference between liquid push-pull reclamation, AHRI 740 recovery standards, and required EPA Form 3310 manifests.

Read HVAC Decommissioning Specs →
Regulatory Guide 02

Underground Oil Tank Removal vs. In-Place Foam Abandonment

Understand when API 1604 in-place concrete slurry or structural foam abandonment is accepted by municipal Fire Marshals versus physical excavation. Outlines soil sampling thresholds, DEC/DEP notifications, and environmental closure certificates.

Read Oil Tank Decommissioning Specs →
Engineering Guide 03

Basement Boiler Extractions: Cold-Cutting vs. Sectional Unbolting

Subgrade mechanical room rigging requires strict engineering to prevent foundation cracking or structural damage. Discover how hydraulic splitters, plasma cutters under hot-work fire watch, and low-profile modular gantries extract 50,000 lb boilers.

Read Boiler Rigging Specs →
Commercial Guide 04

Supermarket Refrigeration Rack Teardown & Lease Surrender

Closing or remodeling a grocery store requires rapid overnight refrigerant recovery across parallel compressor racks, walk-in boxes, and retail cases. Learn how to eliminate tenant liability before property lease surrender.

Read Supermarket Decommissioning Specs →
Interactive Engineering Tool

Mechanical Decommissioning & Rigging Estimator

Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.

Decommissioning Parameters & Standards:
• Boilers: Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filings
• Chillers: Push-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoisting
• Fuel Tanks: API 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificate
• Rooftop RTUs: DOT street closure, engineered crane lift plans & curb cap weatherproofing
Estimated Rigging & Environmental Scope:Turnkey Rigging & EPA Manifest
Crane / Rigging Class:Modular Hydraulic Gantry & Skates
EPA Refrigerant Scope:EPA 608 Form 3310 Evacuation
Permit Filings:DOB Demo & State Environmental
Engineering & Environmental Specification Matrix

Mechanical Decommissioning, Heavy Rigging & Equipment Removal Technical & Safety Specs in NY, NJ & CT

Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.

Equipment CategoryRigging & Extraction MethodEnvironmental & EPA ProtocolPermits & Code FilingsTurnaround & Capacity
Heating Boilers & Oil TanksHydraulic gantries, machine skates, cold cutting, vacuum sludge tankersInert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screeningMunicipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks
Packaged HVAC & AC Units40 to 300-ton mobile cranes, street closure rigging, curb cap flashingEPA Section 608 certified deep vacuum freon recovery, electrical LOTODOT street closure permits, crane lift plans, pedestrian sidewalk protection3 to 150-ton RTUs · Weekend & Overnight Picks
Industrial Chillers & TowersEngineered lift gantries, hydraulic toe jacks, lowboy heavy transportHigh-volume push-pull freon reclamation, oil manifesting, glycol loop drainingDEP air resources retirement, hazardous waste manifests, PE stamped lift plans50 to 1,500+ Tons (Centrifugal, Screw, Absorption)
Commercial Refrigeration RacksCam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioningMultiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifestsCommercial lease surrender environmental sign-offs & scrap recycling certificatesSingle Box to 100,000 Sq Ft Supermarket & Cold Storage
Turnkey Mechanical Decommissioning Framework

4-Stage Code-Compliant Mechanical Decommissioning Protocol

We manage every stage of the process—from filing municipal permits and EPA 608 refrigerant recovery to heavy gantry rigging and certified metal recycling.

01
5-Minute Callback Goal

Priority Intake & Site Review

Submit your equipment details via our form above. Our engineering desk aims to call you back within 5 minutes to review equipment tonnage, access constraints, and project timeline.

02
DOB, DEC & Fire Marshal

Turnkey Permitting & Utility LOTO

We file all municipal building demolition and environmental permits, coordinate street closures, and execute certified electrical, gas, and hydronic lock-out/tag-out in your facility.

03
Safe Cold-Cutting & Cranes

EPA 608 Recovery & Heavy Rigging

Our universal certified technicians perform deep vacuum refrigerant reclamation into DOT cylinders, section heavy vessels, and extract equipment via hydraulic gantries and cranes.

04
Full Liability Termination

Manifests, Scrap & Official Closeout

We supply completed EPA Form 3310 manifests, hazardous waste disposal slips, certified metal scrap scale credits, and official municipal decommissioning closure letters.

Questions Answered

Compliance & Permitting FAQ

Detailed answers regarding mechanical decommissioning, EPA Section 608 compliance, municipal permitting, and heavy equipment extraction.

Who files municipal mechanical demolition and environmental permits?

United Decommission turnkey handles all municipal Department of Buildings (DOB) mechanical demolition filings, Department of Environmental Protection (DEP) notifications, and local Fire Marshal paperwork.

What documentation is provided after refrigerant recovery?

We provide official EPA Form 3310 refrigerant recovery manifests detailing the recovered refrigerant type, cylinder serial numbers, recovered weight in pounds, and certified reclamation facility destination.

Can an underground fuel oil tank be abandoned in place?

Yes, when approved by the local Fire Marshal and environmental authorities, in-place abandonment using certified inert solid materials such as concrete slurry or hydrophobic cellular foam is executed in strict compliance with API 1604.

We Go To The Customer · 24/7 Site Assessment & Heavy Removal

Ready to Decommission or Remove Heavy Mechanical Infrastructure?

We manage every stage—from municipal DOB/DEP permits and EPA Section 608 refrigerant recovery to heavy crane rigging and scrap credit offsets. Serving NY, NJ, CT and nationwide with a 5-minute callback goal.