24/7 Mechanical Decommissioning & Removal Dispatch
Boilers, Chillers, Fuel Oil Tanks, HVAC RTUs & Commercial Refrigeration. Turnkey Permitting & EPA 608 Freon Recovery.
I Want More Information
Data Center Mechanical Plant Decommissioning & Precision Rigging
CRAC/CRAH Units, High-Density Liquid Chillers, Raised-Floor Extractions & Live-Facility Protection.
Engineered Data Centers & Critical Facilities Solutions
Decommissioning mechanical cooling infrastructure in live data centers demands surgical precision to protect energized server racks and mission-critical uptime. United Decommission provides turnkey mechanical decommissioning for mission-critical facilities. We decommission Computer Room Air Conditioners (CRAC) and Handlers (CRAH), fluid chillers, dry coolers, and auxiliary generator fuel systems without generating conductive dust or disrupting live raised-floor environments.
On-Site Engineering & Safety Standards:
- Intrinsically safe cold-cutting eliminating airborne metallic dust near server electronics
- Engineered load distribution pads protecting fragile raised-floor pedestal grids
- Rapid weekend and maintenance-window extraction scheduling
- Universal EPA Section 608 certified refrigerant evacuation and disposal logs
Primary Equipment Decommissioned:
- Downflow & Upflow CRAC / CRAH Units (Precision Raised-Floor)
- Modular High-Efficiency Air-Cooled & Water-Cooled Chillers
- Dry Coolers, Condenser Water Loops & Closed-Circuit Towers
- Under-Floor Chilled Water Distribution Headers & Victaulic Piping
- Diesel Generator Sub-Base Fuel Storage Tanks & Day Tanks
Direct Services for Data Centers & Critical Facilities:
Other Industry Solutions:
- • Commercial Real Estate & High-Rise Mechanical Decommissioning
- • Industrial Plant, Factory & Warehouse Mechanical Decommissioning
- • Supermarket, Cold Storage & Distribution Refrigeration Decommissioning
- • Hospitals, Medical Centers & Laboratory Mechanical Decommissioning
- • Schools, Universities & Institutional Facility Mechanical Decommissioning
Mechanical Decommissioning & Rigging Estimator
Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.
Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filingsPush-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoistingAPI 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificateDOT street closure, engineered crane lift plans & curb cap weatherproofingData Centers & Critical Facilities Technical & Safety Specs in NY, NJ & CT
Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.
| Equipment Category | Rigging & Extraction Method | Environmental & EPA Protocol | Permits & Code Filings | Turnaround & Capacity |
|---|---|---|---|---|
| Heating Boilers & Oil Tanks | Hydraulic gantries, machine skates, cold cutting, vacuum sludge tankers | Inert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screening | Municipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure | 2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks |
| Packaged HVAC & AC Units | 40 to 300-ton mobile cranes, street closure rigging, curb cap flashing | EPA Section 608 certified deep vacuum freon recovery, electrical LOTO | DOT street closure permits, crane lift plans, pedestrian sidewalk protection | 3 to 150-ton RTUs · Weekend & Overnight Picks |
| Industrial Chillers & Towers | Engineered lift gantries, hydraulic toe jacks, lowboy heavy transport | High-volume push-pull freon reclamation, oil manifesting, glycol loop draining | DEP air resources retirement, hazardous waste manifests, PE stamped lift plans | 50 to 1,500+ Tons (Centrifugal, Screw, Absorption) |
| Commercial Refrigeration Racks | Cam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioning | Multiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifests | Commercial lease surrender environmental sign-offs & scrap recycling certificates | Single Box to 100,000 Sq Ft Supermarket & Cold Storage |
4-Stage Code-Compliant Mechanical Decommissioning Protocol
We manage every stage of the process—from filing municipal permits and EPA 608 refrigerant recovery to heavy gantry rigging and certified metal recycling.
Priority Intake & Site Review
Submit your equipment details via our form above. Our engineering desk aims to call you back within 5 minutes to review equipment tonnage, access constraints, and project timeline.
Turnkey Permitting & Utility LOTO
We file all municipal building demolition and environmental permits, coordinate street closures, and execute certified electrical, gas, and hydronic lock-out/tag-out in your facility.
EPA 608 Recovery & Heavy Rigging
Our universal certified technicians perform deep vacuum refrigerant reclamation into DOT cylinders, section heavy vessels, and extract equipment via hydraulic gantries and cranes.
Manifests, Scrap & Official Closeout
We supply completed EPA Form 3310 manifests, hazardous waste disposal slips, certified metal scrap scale credits, and official municipal decommissioning closure letters.
Data Centers & Critical Facilities Decommissioning FAQs
Answers about utility lock-out, EPA Section 608 compliance, crane rigging, and municipal permits.
How do you extract heavy CRAC units across sensitive data center raised floors?
We lay heavy aluminum load-distribution road plates and aircraft-grade floor protection across the tile grid, distributing machine weight across multiple substructure pedestals during rolling.
Can you guarantee zero airborne metal shavings during equipment dismantling in a data center?
Yes. We prohibit abrasive metal grinding wheels in data environments, utilizing pneumatic nibblers, hydraulic shear splitters, and sealed HEPA containment carts to maintain Class 8 cleanroom air quality.
Need Data Centers & Critical Facilities Decommissioned?
24/7 Mobile Rigging Fleet · We Go To The Customer · 5-Minute Callback Goal Across NY, NJ, CT and Nationwide.