Skip to main content
24/7 Priority Decommissioning DispatchEPA Section 608 Certified · 5-Min Callback Goal

24/7 Mechanical Decommissioning & Removal Dispatch

Boilers, Chillers, Fuel Oil Tanks, HVAC RTUs & Commercial Refrigeration. Turnkey Permitting & EPA 608 Freon Recovery.

Attach Equipment / Nameplate Photo (Optional)Allows engineers to verify refrigerant charge, tonnage, and rigging dimensions
No file chosen
Licensed & Insured·EPA 608 Certified·Permits Managed
I Want More Information
Viewing Full Engineering Specs, Permit Protocols, Equipment Rigging Fleet & Regional MatrixBack to Dispatch Form ↑
K-12 School Districts · Universities · Municipal Buildings · Public Works24/7 Mechanical Decommissioning & Rigging

Institutional & Municipal Mechanical Decommissioning Specialists

Historic School Boilers, Underground Fuel Storage Tanks, Central Campus Chillers & Public Works Compliance.

100% LicensedComprehensive InsuranceFull commercial & environmental liability
EPA Section 608Universal CertifiedSafe refrigerant recovery & recycling
Turnkey PermitsDOB · DEC · DEP · EPAAll municipal & state filings managed
Tri-State & NationalNY · NJ · CT & 50 StatesMulti-site corporate rollout capacity
Sector Engineering Protocol

Engineered Schools & Municipal Facilities Solutions

School districts, colleges, and municipal agencies frequently undertake capital energy performance retrofits requiring the retirement of massive legacy heating plants and buried oil tanks. United Decommission has executed hundreds of public works mechanical decommissioning projects. We manage summer vacation fast-track schedules, prevailing wage compliance, certified asbestos abatement coordination, heavy rigging, and state environmental closure filings.

On-Site Engineering & Safety Standards:

  • Strict summer vacation execution guaranteeing campus readiness prior to school opening
  • Comprehensive public works prevailing wage reporting and certified payroll records
  • Turnkey municipal DOB, DEP, and state DEC environmental closure certifications
  • Safe pedestrian perimeters and background-checked, OSHA-certified rigging personnel

Primary Equipment Decommissioned:

  • Heavy Cast Iron & Scotch Marine Campus Heating Boilers
  • Historic Underground Fuel Oil Storage Tanks (USTs) 5,000 to 25,000 Gal
  • Campus Central Plant Chillers & High-Efficiency Cooling Towers
  • Gymnasium & Auditorium Packaged Rooftop HVAC Units
  • Underground Hydronic Steam Vaults & Distribution Manifolds
Interactive Engineering Tool

Mechanical Decommissioning & Rigging Estimator

Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.

Decommissioning Parameters & Standards:
• Boilers: Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filings
• Chillers: Push-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoisting
• Fuel Tanks: API 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificate
• Rooftop RTUs: DOT street closure, engineered crane lift plans & curb cap weatherproofing
Estimated Rigging & Environmental Scope:Turnkey Rigging & EPA Manifest
Crane / Rigging Class:Modular Hydraulic Gantry & Skates
EPA Refrigerant Scope:EPA 608 Form 3310 Evacuation
Permit Filings:DOB Demo & State Environmental
Engineering & Environmental Specification Matrix

Schools & Municipal Facilities Technical & Safety Specs in NY, NJ & CT

Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.

Equipment CategoryRigging & Extraction MethodEnvironmental & EPA ProtocolPermits & Code FilingsTurnaround & Capacity
Heating Boilers & Oil TanksHydraulic gantries, machine skates, cold cutting, vacuum sludge tankersInert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screeningMunicipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks
Packaged HVAC & AC Units40 to 300-ton mobile cranes, street closure rigging, curb cap flashingEPA Section 608 certified deep vacuum freon recovery, electrical LOTODOT street closure permits, crane lift plans, pedestrian sidewalk protection3 to 150-ton RTUs · Weekend & Overnight Picks
Industrial Chillers & TowersEngineered lift gantries, hydraulic toe jacks, lowboy heavy transportHigh-volume push-pull freon reclamation, oil manifesting, glycol loop drainingDEP air resources retirement, hazardous waste manifests, PE stamped lift plans50 to 1,500+ Tons (Centrifugal, Screw, Absorption)
Commercial Refrigeration RacksCam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioningMultiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifestsCommercial lease surrender environmental sign-offs & scrap recycling certificatesSingle Box to 100,000 Sq Ft Supermarket & Cold Storage
Turnkey Mechanical Decommissioning Framework

4-Stage Code-Compliant Mechanical Decommissioning Protocol

We manage every stage of the process—from filing municipal permits and EPA 608 refrigerant recovery to heavy gantry rigging and certified metal recycling.

01
5-Minute Callback Goal

Priority Intake & Site Review

Submit your equipment details via our form above. Our engineering desk aims to call you back within 5 minutes to review equipment tonnage, access constraints, and project timeline.

02
DOB, DEC & Fire Marshal

Turnkey Permitting & Utility LOTO

We file all municipal building demolition and environmental permits, coordinate street closures, and execute certified electrical, gas, and hydronic lock-out/tag-out in your facility.

03
Safe Cold-Cutting & Cranes

EPA 608 Recovery & Heavy Rigging

Our universal certified technicians perform deep vacuum refrigerant reclamation into DOT cylinders, section heavy vessels, and extract equipment via hydraulic gantries and cranes.

04
Full Liability Termination

Manifests, Scrap & Official Closeout

We supply completed EPA Form 3310 manifests, hazardous waste disposal slips, certified metal scrap scale credits, and official municipal decommissioning closure letters.

Questions Answered

Schools & Municipal Facilities Decommissioning FAQs

Answers about utility lock-out, EPA Section 608 compliance, crane rigging, and municipal permits.

Can you complete a large school boiler and oil tank removal during summer recess in {Town}?

Yes. We routinely execute complex school mechanical decommissioning during the tight 8-week summer break, ensuring all heavy rigging, inspections, and cleanups are completed before faculty and students return.

Do you comply with municipal prevailing wage and certified payroll requirements?

Yes. United Decommission fully complies with state and municipal prevailing wage mandates, delivering weekly certified payroll reports and public bidding documentation.

We Go To The Customer · 24/7 Site Assessment & Heavy Removal

Need Schools & Municipal Facilities Decommissioned?

24/7 Mobile Rigging Fleet · We Go To The Customer · 5-Minute Callback Goal Across NY, NJ, CT and Nationwide.