Skip to main content
24/7 Priority Decommissioning DispatchEPA Section 608 Certified · 5-Min Callback Goal

24/7 Mechanical Decommissioning & Removal Dispatch

Boilers, Chillers, Fuel Oil Tanks, HVAC RTUs & Commercial Refrigeration. Turnkey Permitting & EPA 608 Freon Recovery.

Attach Equipment / Nameplate Photo (Optional)Allows engineers to verify refrigerant charge, tonnage, and rigging dimensions
No file chosen
Licensed & Insured·EPA 608 Certified·Permits Managed
I Want More Information
Viewing Full Engineering Specs, Permit Protocols, Equipment Rigging Fleet & Regional MatrixBack to Dispatch Form ↑
Supermarket Chains · Cold Storage Warehouses · Food Processing · Ghost Kitchens24/7 Mechanical Decommissioning & Rigging

Supermarket & Cold Storage Refrigeration Decommissioning Specialists

Parallel Compressor Racks, Walk-In Freezers, Refrigerated Display Cases & Certified EPA Freon Reclamation.

100% LicensedComprehensive InsuranceFull commercial & environmental liability
EPA Section 608Universal CertifiedSafe refrigerant recovery & recycling
Turnkey PermitsDOB · DEC · DEP · EPAAll municipal & state filings managed
Tri-State & NationalNY · NJ · CT & 50 StatesMulti-site corporate rollout capacity
Sector Engineering Protocol

Engineered Supermarkets & Cold Storage Solutions

Supermarket remodels and distribution warehouse closures demand rapid turnaround to prevent store downtime or meet aggressive lease surrender dates. United Decommission specializes in large-scale commercial refrigeration decommissioning. We safely evacuate thousands of pounds of high-GWP refrigerants from parallel compressor multiplex racks, dismantle multi-room walk-in cooler complexes, remove refrigerated display merchandisers, and handle secondary glycol loop disposal.

On-Site Engineering & Safety Standards:

  • EPA Section 608 Universal certified technicians with high-volume liquid push-pull carts
  • Overnight fast-track dismantling tailored for grocery store remodels without lost retail sales
  • Careful non-marking extraction protecting polished terrazzo and epoxy floor finishes
  • Formal EPA Form 3310 documentation and refrigerant destruction manifests

Primary Equipment Decommissioned:

  • Parallel Multiplex Compressor Racks (Low & Medium Temp)
  • Commercial Walk-In Cooler & Freezer Panel Complexes
  • Multi-Deck Refrigerated Grocery Merchandisers & Island Cases
  • Rooftop Remote Air-Cooled Refrigerant Condensers & Evaporators
  • Secondary Glycol Chilled Loop Pumping & Containment Systems
Interactive Engineering Tool

Mechanical Decommissioning & Rigging Estimator

Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.

Decommissioning Parameters & Standards:
• Boilers: Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filings
• Chillers: Push-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoisting
• Fuel Tanks: API 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificate
• Rooftop RTUs: DOT street closure, engineered crane lift plans & curb cap weatherproofing
Estimated Rigging & Environmental Scope:Turnkey Rigging & EPA Manifest
Crane / Rigging Class:Modular Hydraulic Gantry & Skates
EPA Refrigerant Scope:EPA 608 Form 3310 Evacuation
Permit Filings:DOB Demo & State Environmental
Engineering & Environmental Specification Matrix

Supermarkets & Cold Storage Technical & Safety Specs in NY, NJ & CT

Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.

Equipment CategoryRigging & Extraction MethodEnvironmental & EPA ProtocolPermits & Code FilingsTurnaround & Capacity
Heating Boilers & Oil TanksHydraulic gantries, machine skates, cold cutting, vacuum sludge tankersInert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screeningMunicipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks
Packaged HVAC & AC Units40 to 300-ton mobile cranes, street closure rigging, curb cap flashingEPA Section 608 certified deep vacuum freon recovery, electrical LOTODOT street closure permits, crane lift plans, pedestrian sidewalk protection3 to 150-ton RTUs · Weekend & Overnight Picks
Industrial Chillers & TowersEngineered lift gantries, hydraulic toe jacks, lowboy heavy transportHigh-volume push-pull freon reclamation, oil manifesting, glycol loop drainingDEP air resources retirement, hazardous waste manifests, PE stamped lift plans50 to 1,500+ Tons (Centrifugal, Screw, Absorption)
Commercial Refrigeration RacksCam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioningMultiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifestsCommercial lease surrender environmental sign-offs & scrap recycling certificatesSingle Box to 100,000 Sq Ft Supermarket & Cold Storage
Turnkey Mechanical Decommissioning Framework

4-Stage Code-Compliant Mechanical Decommissioning Protocol

We manage every stage of the process—from filing municipal permits and EPA 608 refrigerant recovery to heavy gantry rigging and certified metal recycling.

01
5-Minute Callback Goal

Priority Intake & Site Review

Submit your equipment details via our form above. Our engineering desk aims to call you back within 5 minutes to review equipment tonnage, access constraints, and project timeline.

02
DOB, DEC & Fire Marshal

Turnkey Permitting & Utility LOTO

We file all municipal building demolition and environmental permits, coordinate street closures, and execute certified electrical, gas, and hydronic lock-out/tag-out in your facility.

03
Safe Cold-Cutting & Cranes

EPA 608 Recovery & Heavy Rigging

Our universal certified technicians perform deep vacuum refrigerant reclamation into DOT cylinders, section heavy vessels, and extract equipment via hydraulic gantries and cranes.

04
Full Liability Termination

Manifests, Scrap & Official Closeout

We supply completed EPA Form 3310 manifests, hazardous waste disposal slips, certified metal scrap scale credits, and official municipal decommissioning closure letters.

Questions Answered

Supermarkets & Cold Storage Decommissioning FAQs

Answers about utility lock-out, EPA Section 608 compliance, crane rigging, and municipal permits.

How do you prevent refrigerant venting during large supermarket rack decommissioning?

We utilize commercial water-cooled recovery carts and heavy DOT recovery cylinders, pulling liquid and vapor phases down to EPA-mandated vacuum levels and verifying zero positive pressure before line severance.

Do you handle the complete teardown and disposal of walk-in cooler panels?

Yes. Our crews unlock cam-lock fasteners, remove ceilings and structural hangars, disassemble insulated panels, and haul them away for certified recycling and scrap diversion.

We Go To The Customer · 24/7 Site Assessment & Heavy Removal

Need Supermarkets & Cold Storage Decommissioned?

24/7 Mobile Rigging Fleet · We Go To The Customer · 5-Minute Callback Goal Across NY, NJ, CT and Nationwide.