Skip to main content
24/7 Priority Decommissioning DispatchEPA Section 608 Certified · 5-Min Callback Goal

24/7 Mechanical Decommissioning & Removal Dispatch

Boilers, Chillers, Fuel Oil Tanks, HVAC RTUs & Commercial Refrigeration. Turnkey Permitting & EPA 608 Freon Recovery.

Attach Equipment / Nameplate Photo (Optional)Allows engineers to verify refrigerant charge, tonnage, and rigging dimensions
No file chosen
Licensed & Insured·EPA 608 Certified·Permits Managed
I Want More Information
Viewing Full Engineering Specs, Permit Protocols, Equipment Rigging Fleet & Regional MatrixBack to Dispatch Form ↑
Hospitals · Medical Centers · Biotech Labs · Pharmaceutical Cleanrooms24/7 Mechanical Decommissioning & Rigging

Healthcare Facility Mechanical Decommissioning & Clean Extraction

Hospital Chiller Plants, Steam Sterilization Boilers, Medical Refrigeration & Strict ICRA Infection Control Protocols.

100% LicensedComprehensive InsuranceFull commercial & environmental liability
EPA Section 608Universal CertifiedSafe refrigerant recovery & recycling
Turnkey PermitsDOB · DEC · DEP · EPAAll municipal & state filings managed
Tri-State & NationalNY · NJ · CT & 50 StatesMulti-site corporate rollout capacity
Sector Engineering Protocol

Engineered Hospitals & Healthcare Facilities Solutions

Mechanical work within operational hospitals and pharmaceutical facilities requires stringent infection control risk assessment (ICRA) compliance, dust containment, noise mitigation, and zero contamination of adjacent clinical wings. United Decommission brings decades of healthcare mechanical decommissioning experience. We handle hospital chiller replacements, high-pressure steam boiler extractions, and medical laboratory refrigeration disposal with positive-pressure HEPA barriers and hospital-grade protocols.

On-Site Engineering & Safety Standards:

  • Full compliance with ICRA Class IV containment, negative air machines, and HEPA exhaust
  • Vibration and acoustic monitoring to safeguard sensitive imaging suites and patient wings
  • EPA certified freon recovery and hazardous lubrication oil manifesting
  • Certified mechanical engineers coordinating seamless isolation with hospital facilities staff

Primary Equipment Decommissioned:

  • Hospital Redundant Water-Cooled Chillers & Cooling Towers
  • High-Pressure Clean Steam Boilers for Autoclave Sterilization
  • Ultra-Low Temperature (-80°C) Medical Freezers & Pharmacy Coolers
  • Critical Care Air Handling Units (AHUs) & HEPA Filtration Banks
  • Emergency Backup Generator Fuel Storage Systems
Interactive Engineering Tool

Mechanical Decommissioning & Rigging Estimator

Estimate heavy rigging crane tonnage, EPA Section 608 refrigerant recovery scope, and municipal permit requirements for your facility. Click Apply to Dispatch Form to pre-fill your technical specs for our 24/7 engineering desk.

Decommissioning Parameters & Standards:
• Boilers: Sectional unbolting or cold hydraulic shearing; basement machine skates & DOB demo filings
• Chillers: Push-pull liquid/vapor recovery into DOT cylinders; 50T to 1,500T gantry/crane hoisting
• Fuel Tanks: API 1604 / 2015 degas, sludge pump-out, soil testing & Fire Marshal closure certificate
• Rooftop RTUs: DOT street closure, engineered crane lift plans & curb cap weatherproofing
Estimated Rigging & Environmental Scope:Turnkey Rigging & EPA Manifest
Crane / Rigging Class:Modular Hydraulic Gantry & Skates
EPA Refrigerant Scope:EPA 608 Form 3310 Evacuation
Permit Filings:DOB Demo & State Environmental
Engineering & Environmental Specification Matrix

Hospitals & Healthcare Facilities Technical & Safety Specs in NY, NJ & CT

Every project execution includes licensed rigging oversight, EPA Section 608 certified refrigerant recovery, and turnkey municipal permit management across NY, NJ & CT.

Equipment CategoryRigging & Extraction MethodEnvironmental & EPA ProtocolPermits & Code FilingsTurnaround & Capacity
Heating Boilers & Oil TanksHydraulic gantries, machine skates, cold cutting, vacuum sludge tankersInert nitrogen gas purging, fuel blanking, certified sludge disposal & soil screeningMunicipal DOB mechanical demo, Fire Marshal tank abandonment, DEC/DEP closure2,500 to 80,000+ lbs Boilers · 275 to 25k Gal Tanks
Packaged HVAC & AC Units40 to 300-ton mobile cranes, street closure rigging, curb cap flashingEPA Section 608 certified deep vacuum freon recovery, electrical LOTODOT street closure permits, crane lift plans, pedestrian sidewalk protection3 to 150-ton RTUs · Weekend & Overnight Picks
Industrial Chillers & TowersEngineered lift gantries, hydraulic toe jacks, lowboy heavy transportHigh-volume push-pull freon reclamation, oil manifesting, glycol loop drainingDEP air resources retirement, hazardous waste manifests, PE stamped lift plans50 to 1,500+ Tons (Centrifugal, Screw, Absorption)
Commercial Refrigeration RacksCam-lock panel teardown, non-marking floor dollies, sparkless pipe sectioningMultiplex rack freon evacuation, POE oil collection, EPA Form 3310 manifestsCommercial lease surrender environmental sign-offs & scrap recycling certificatesSingle Box to 100,000 Sq Ft Supermarket & Cold Storage
Turnkey Mechanical Decommissioning Framework

4-Stage Code-Compliant Mechanical Decommissioning Protocol

We manage every stage of the process—from filing municipal permits and EPA 608 refrigerant recovery to heavy gantry rigging and certified metal recycling.

01
5-Minute Callback Goal

Priority Intake & Site Review

Submit your equipment details via our form above. Our engineering desk aims to call you back within 5 minutes to review equipment tonnage, access constraints, and project timeline.

02
DOB, DEC & Fire Marshal

Turnkey Permitting & Utility LOTO

We file all municipal building demolition and environmental permits, coordinate street closures, and execute certified electrical, gas, and hydronic lock-out/tag-out in your facility.

03
Safe Cold-Cutting & Cranes

EPA 608 Recovery & Heavy Rigging

Our universal certified technicians perform deep vacuum refrigerant reclamation into DOT cylinders, section heavy vessels, and extract equipment via hydraulic gantries and cranes.

04
Full Liability Termination

Manifests, Scrap & Official Closeout

We supply completed EPA Form 3310 manifests, hazardous waste disposal slips, certified metal scrap scale credits, and official municipal decommissioning closure letters.

Questions Answered

Hospitals & Healthcare Facilities Decommissioning FAQs

Answers about utility lock-out, EPA Section 608 compliance, crane rigging, and municipal permits.

Can you decommission mechanical equipment adjacent to operational patient wings?

Yes. We construct sealed anterooms, operate continuous negative-air HEPA scrubbers, and use low-noise, sparkless cold-cutting techniques to completely protect patient and clinical environments.

Do you manage biohazard or laboratory chemical clearance prior to equipment removal?

We coordinate with hospital Environmental Health & Safety (EHS) officers to verify chemical, radiological, and biological clearance certification prior to touching laboratory refrigeration and HVAC systems.

We Go To The Customer · 24/7 Site Assessment & Heavy Removal

Need Hospitals & Healthcare Facilities Decommissioned?

24/7 Mobile Rigging Fleet · We Go To The Customer · 5-Minute Callback Goal Across NY, NJ, CT and Nationwide.